I design every layer.

oguz atakan gul

Architect, PhD. Interior Designer, MA. Architectural Engineer, MSc.

A clear glass concrete mixer containing cement and stone aggregate, with a long cast shadow extending to the left and bright refracted light spreading across the lower-right floor.

work

Portfolio — Cover

Portfolio 2026 by Oguz Atakan Gul. A pale cover with a subtle repeated cross pattern, letterspaced title and name.

PORTFOLIO. 2026. OGUZ ATAKAN GUL.

Portfolio — Pages 1–2: Resume and table of content

The opening spread presents Oguz Atakan Gul’s resume, neuroarchitecture research statement, education, contact information and software skills, followed by five named portfolio projects.

OGUZ ATAKAN GUL — ARCHITECT, INTERIOR DESIGNER, ARCHITECTURAL ENGINEER.

With a strong foundation in architectural engineering and interior design, I bring a multidisciplinary approach to the planning and design of buildings and landscapes. My expertise spans technical precision, creative innovation, and holistic design thinking.

Currently pursuing a Doctorate in Architecture, my research focuses on neuroarchitecture, exploring how architectural and interior environments influence human perception, behavior, and well-being.

CONTACT

EDUCATION

  • BREUER MARCELL DOCTORAL SCHOOL OF ARCHITECTURE — DLA - Doctor of Liberal Arts, 2023–2027.
  • HARVARD UNIVERSITY — Intensive Course - Architectural Imagination, 2023.
  • UNIVERSITY OF PÉCS — Master of Arts - MA, Interior and Spatial Design, 2020–2022.
  • UNIVERSITY OF PÉCS — One Tier Master - BSc & MSc, Architecture, 2015–2020.

TECHNICAL ACUMEN

Archicad | Revit | Take-off & Estimating Software. Lumion | Twinmotion | Photoshop | InDesign.

CERTIFICATES

Archicad BIM Manager Certification Program, 2023.

TABLE OF CONTENT

  • PROJECT 1 — TRBN_01. TYPE: ICE SKATING FACILITY.
  • PROJECT 2 — TEN / 29. TYPE: RESIDENTIAL INTERIOR RENOVATION.
  • PROJECT 3 — BIAI_EDU. TYPE: ELEMENTARY SCHOOL.
  • PROJECT 4 — FRM:FNCT. TYPE: ACADEMIC DESIGN COMPETITION.
  • PROJECT 5 — DUAL//UNIT. TYPE: FURNITURE HACK / OBJECT DESIGN.

Portfolio — Pages 3–4: TRBN_01 introduction

TRBN_01 proposes renewal of the ice-skating facility in Pécs, Hungary. An aerial visualization shows the long service building in front of the outdoor rink, with surrounding paths, lawn and trees.

01 — TRBN_01. LOCATION: PÉCS, HUNGARY. TYPE: ICE SKATING FACILITY.

The TRBN_01 project reimagines the aging ice-skating stadium of Pécs, Hungary, bringing new life to a structure long frozen in time. Originally built in the 1980s, the existing facility—comprising a 1741.96 m² ice rink, a single tribune, and an under-tribune service block—has remained untouched for decades, both in material and design. This proposal introduces a comprehensive redesign that merges architectural and interior strategies with structural renewal. The aim is not merely to modernize but to reestablish the facility as a vibrant, functional, and contemporary space for athletes and spectators alike. TRBN_01 integrates spatial logic, material honesty, and structural clarity to bridge the memory of the past with the needs of the present, repositioning the stadium as a local hub for movement, performance, and community.

Page 4 — Aerial architectural visualization: a long, low service building and spectator tribune border one long side of an outdoor ice rink. Glazed openings reveal rooms beneath the tribune. The rink has rounded ends and circular ice markings, and is enclosed by boards and clear screens. Paths cross the surrounding lawn, with trees at the foreground edge.

Portfolio — Pages 5–6: Conceptual intervention, existing reality and site plan

An exploded axonometric separates the tribune roof, glazed intervention and service block beside photographs of the existing rink building. The site plan highlights the rink and its plot within the surrounding street pattern.

CONCEPTUAL INTERVENTION — Unfolding the Layers

This exploded axonometric drawing proposes a surgical rethinking of the stadium. Structural clarity, spatial hierarchy, and material articulation form the foundation of a contemporary redesign, offering a new spatial logic while respecting the existing footprint.

The exploded drawing separates the stepped tribune/roof structure above, a glazed strip and concrete supports in the middle, and the ground-level service enclosure below. Dashed vertical lines align the layers.

EXISTING REALITY — Stuck in the 1980s

The existing condition of the Pécs Ice Rink reflects decades of stagnation, both functionally and aesthetically. Constructed in the early 1980s, the building’s spatial layout, materials, and overall atmosphere have remained virtually untouched since its inception. While the facility continues to serve the local community, the signs of aging are evident in every corner—from worn-out surfaces to inefficient circulation and outdated infrastructure. This photographic series captures the tension between nostalgia and obsolescence, highlighting the urgent need for architectural intervention.

The black-and-white photographic collage shows the outdoor spectator tribune, concrete exterior supports and service spaces, roof soffits, doors, bench-lined corridors and occupied changing/reception areas.

SITE PLAN — The rink and irregular site boundary are highlighted in yellow against a dark plan of surrounding roads and building footprints. A north indicator appears beside the site-plan title.

Portfolio — Pages 7–8: Structural concept, north elevation and floor plan

Solar diagrams and four sectional stages explain replacement of the restrictive two-plane interior roof by a single plane and a north-facing window. The facing page pairs the north elevation with the long service-block floor plan.

Solar diagrams show the building and rink with cardinal directions and sun positions labeled 8:00, 12:00, 17:00 and 19:00.

Existing Structural System

The existing precast concrete load-bearing structure was originally designed to support the spectator tribune above, forming the primary structural framework of the building.

Existing Roof System

The existing two-plane roof sits beneath the tribune structure, enclosing the interior while restricting ceiling height and limiting opportunities for larger openings.

Proposed Roof System

The proposed single-plane roof simplifies the existing geometry, creating a more generous interior space and allowing larger openings along the north-facing elevation.

Concept

A large north-facing window introduces soft, diffuse daylight into the changing rooms and café, improving spatial comfort and functionality for visitors using the ice-skating facilities.

NORTH ELEVATION — A long, low frontage follows the rising and falling profile of the spectator structure. Repeated concrete supports frame the broad glazed opening; the center high point is marked +10.56.

FLOOR PLAN — The service rooms form a narrow strip between the street-side frontage and the rink. The plan shows a central entrance, a continuous circulation zone, larger central spaces with seating and small tables, and smaller subdivided service rooms toward the ends. The rink occupies the foreground side.

Portfolio — Pages 9–10: Circulation and changing-space comparison

A proposed entrance and changing-space visualization is paired with an existing bench-lined corridor photograph and a proposed rink-side passage. Dark circulation surfaces contrast with bright changing areas and linear lighting.

Page 9 — Proposed interior visualization: the rink-side circulation route has a dark floor and dark wall with a line of glowing angular light frames. Beside it, pale walls and a pale floor define changing alcoves with low storage lockers, benches and skate-changing visitors. High glazing rises beneath the tribune structure, with rectangular suspended lights and a wood-slat bench.

Page 10, left — Existing black-and-white corridor photograph: a narrow passage has a low ribbed sloping ceiling, doors along the right and a bench along the left.

Page 10, right — Proposed corridor visualization: a long wood-slat bench and illuminated base run beside a dark wall with opposing directional arrows. The rink railing and displays are opposite; the route opens into a brighter interior farther ahead.

Portfolio — Pages 11–12: Interior elevations and locker-space visualization

Two transverse interior elevations show the wedge-shaped spaces beneath the tribune and the inserted horizontal interior ceiling. The facing visualization shows low bench lockers, tall lockers and lit partition alcoves.

INTERIOR ELEVATIONS — Two mirrored transverse drawings show the steep stepped spectator tribune outside and the shallow single-plane interior roof below. Horizontal suspended lights sit over changing and café spaces. The left drawing includes stools and a wall counter; the right includes tall lockers and figures for scale.

Page 12 — Proposed interior visualization: low storage lockers beneath a dark continuous bench line the left wall; tall narrow lockers line the right. Pale freestanding partition walls and lit overhead edges form changing alcoves below the high dark tribune soffit. Suspended rectangular light fittings and the broad pale floor connect the spaces.

Portfolio — Pages 13–14: Wayfinding, café passage and longitudinal elevations

An interior visualization uses opposing arrows, bench lighting and vertical light strips to distinguish a rink-side passage from the bright café approach. Two long interior elevations show the counter, lockers, doors and repeated lighting.

Page 13 — Proposed interior visualization: a wood-slat bench sits against a dark wall bearing two large opposing arrows. A bright central passage leads toward a café counter. A gray door at the right is framed by vertical white light strips, while high glazing and recessed lights sit beneath the spectator structure.

Page 14 — Two longitudinal interior elevations show the long sloping structure and continuous ceiling line above the rooms. The upper elevation includes doors, a glazed section and a café wall counter with stools; the lower elevation includes directional arrow graphics, doors, low lockers and human figures indicating scale.

Portfolio — Pages 15–16: Existing interior and proposed changing areas

An existing occupied changing-space photograph is paired with a visualization of organized locker alcoves beside a broad stair. The comparison contrasts the original low ribbed ceiling and worn floor with pale partitions, continuous benches and overhead daylight.

Page 15 — Existing black-and-white interior photograph: visitors change into skates in a room with a low ribbed sloping ceiling, roof beams, windows, steps and small tables. Dark mats cover portions of the floor.

Page 16 — Proposed interior visualization: pale partitions and overhead frames define small locker and bench alcoves. Low numbered lockers wrap the central changing area, while taller lockers stand at the left. A broad white stair rises beside the alcove on the right, beneath high glazing and suspended rectangular lights.

Portfolio — Pages 17–18: Building sections and construction details

A roof-open cutaway and sections expose the service spaces beneath the spectator tribune. The opposite page expands Details A–D into wall, roof, floor, seating, drawer and sliding-panel build-ups, drawn in yellow on black.

SECTION A / SECTION B — A roof-open oblique cutaway shows the service rooms, changing alcoves, central access and continuous rink-side route within the long building. Below, longitudinal and transverse sections relate the inserted interior spaces and ceiling to the repeated concrete tribune structure above.

The technical drawing on page 18 shows the stepped tribune over a sloping layered roof and a full-height interior section, with enlarged wall/furniture details labeled A, B, C and D. The layer specifications below follow the labels printed on the sheet.

Detail A & B

  • L1 – Interior Wall with Timber Backing: Washable Paint Plaster – 0.5 cm; Reinforced Concrete Wall – 29.0 cm; Washable Paint Plaster – 0.5 cm; Timber Back Plate – 1.0 cm.
  • L2 – Floor Build-Up over R.C. Slab: Skate-Resistant Rubber Flooring – 3.0 cm; Cement Screed – 5.0 cm; Rigid Thermal Insulation – 10.0 cm; Waterproofing Layer – 1.0 cm; Reinforced Concrete Slab – 20.0 cm.
  • L3 – Interior Partition Finish: Washable Paint Plaster – 0.5 cm; Gypsum Board – 2.0 cm; Steel “U” Channel Support – 6.0 cm; Gypsum Board – 2.0 cm; Washable Paint Plaster – 0.5 cm.
  • L4 – Seating Element Section: Timber Seating – 5.0 cm; Timber Plate – 2.0 cm; Steel “U” Channel Support – 5.0 cm.
  • L5 – Vertical Front Detail: Steel Bar – 2.0 cm; Timber Front Board – 1.0 cm; Steel “U” Channel Support – 5.0 cm.
  • L6 – Floor / Step Build-Up: Timber Rafters – 3×5 cm; Concrete Mass – 5.0 cm; Steel “U” Channel Support – 5.0 cm; Chipboard Plate – 1.0 cm.

Detail C

  • L1 – Wall Section with Decorative Cover: Mdflam Cover – 2.0 cm; Timber Support Back Plate – 3.0 cm; Washable Paint Plaster – 0.5 cm; Gypsum Board – 2.0 cm; Steel “U” Channel Support – 6.0 cm; Gypsum Board – 2.0 cm; Washable Paint Plaster – 0.5 cm.
  • L2 – Sliding Panel Assembly: Timber Plate – 3.0 cm; Roller Slides – 3.0 cm; Timber Plate – 3.0 cm.
  • L3 – Drawer Side Construction: Drawer Mdflam Cover – 2.0 cm; Timber Support Plate – 3.0 cm; Steel “U” Channel Support – 5.0 cm; Timber Support Back Plate – 3.0 cm.
  • L4 – Floor / Step Build-Up: Timber Rafters – 3×5 cm; Concrete Mass – 5.0 cm; Steel “U” Channel Support – 5.0 cm; Chipboard Plate – 1.0 cm.
  • L5 – Soft Sliding Panel with Insulation: Polyurethane Foam – 5.0 cm; Timber Plate – 3.0 cm; Roller Slides – 3.0 cm; Timber Plate – 3.0 cm.

Detail D

  • L1 – Interior Partition Finish: Washable Paint Finish – 0.5 cm; Gypsum Board – 2.0 cm; Steel “U” Channel Support – 5.0 cm; Gypsum Board – 2.0 cm; Washable Paint Finish – 0.5 cm.
  • L2 – Roof Build-Up: Metal Roof Cladding – 2.0 cm; Vapor Barrier Membrane – 0.5 cm; Waterproofing Layer – 0.5 cm; Rigid Thermal Insulation – 14.0 cm; Gypsum Board – 2.0 cm; Steel Roof Rafter – 5×5 cm; Ventilated Air Cavity – 10.0 cm; Steel Roof Rafter – 5×5 cm; Gypsum Board – 2.0 cm; Interior Plaster Finish – 1.0 cm.
  • L3 – Raised Floor System: Structural Concrete Mass – 5.0 cm; Chipboard Panel – 1.0 cm; Steel “U” Channel Support – 5.0 cm.
  • L4 – Movable Platform: Aluminum Roller Bar – 3.0 cm; Rubber Roller Layer – 2.0 cm; Metal Platform Surface – 3.0 cm; Rubber Roller Layer – 2.0 cm.
  • L5 – Exterior Wall Section: Reinforced Concrete Wall – 14.0 cm; Rigid Thermal Insulation – 10.0 cm; Waterproofing Layer – 0.5 cm; Vapor Barrier Membrane – 0.5 cm; Metal Cladding Finish – 2.0 cm.

Portfolio — Pages 19–20: Café and seating visualizations

Two opposing interior views show continuous timber bench seating, small white oval tables and freestanding pale partitions under the tribune. Dark upper surfaces, high glazing and suspended rectangular lights frame the shared café and circulation space.

Page 19 — Proposed café/changing interior: a continuous timber bench with small oval white tabletops runs along the right wall. Pale rectangular frames separate open seating and changing alcoves. The long central pale floor connects these areas beneath suspended rectangular light fittings and dark sloping upper surfaces.

Page 20 — Reverse interior view: the timber bench and oval tables run along the left, against a dark wall. Freestanding pale walls and overhead frames divide the long hall without closing its circulation route. High glazing, recessed spots and suspended light fittings illuminate the space.

Portfolio — Pages 21–22: Existing interior and acknowledgements

A black-and-white photograph records the existing skate-changing area. The closing page thanks Prof. Dr. Donát Rétfalvi for nearly thirteen years of guidance from bachelor’s study through doctoral work.

Page 21 — Existing interior photograph: visitors stand at small tables in the skate-changing area beneath a low ribbed ceiling and exposed beams. Long fluorescent fittings hang overhead; windows and a bench line the right side, and mats cover parts of the floor.

My heartfelt thanks to Prof. Dr. Donát Rétfalvi, whose encouragement inspired me to revisit and renew this project. For nearly thirteen years, his guidance has accompanied my journey from my bachelor’s degree through my master’s in interior design and into my doctoral studies. His trust, insight and continued support have shaped both my work and my understanding of architecture.

Portfolio — Oguz Atakan Gul, front cover

Architectural Visits

CV

Education

  • University of Pécs

    • DLA — Doctor of Liberal Arts in Architecture

      Breuer Marcell Doctoral School of Architecture

      2023–2027

    • MA — Master’s Degree in Interior and Spatial Design

      Faculty of Engineering and Information Technology

      2020–2022

    • MSc — Master’s Degree in Architectural Engineering

      Faculty of Engineering and Information Technology

      2018–2020

    • BSc — Bachelor’s Degree in Architecture

      Faculty of Engineering and Information Technology

      2015–2018

  • Harvard University · HarvardX

    • Intensive Course in Architectural Imagination

      July–December 2023

Experience

  • University of Pécs

    • International Student Mentor

      July 2026–Present

    • Doctoral Candidate

      September 2023–Present

  • City Pearl

    • Site Architect

      2025–2026

      Budapest, Hungary · On-site

  • Meer

    • Architectural Content Writer

      September 2023–Present

      Budva, Montenegro · Remote

  • OAG Studio · Freelance

    • Architect

      July 2020–Present

      Hybrid

Honors & Awards

  • MEK — Chamber of Hungarian Architects

    • Winning Entry in the School Design Competition

      2023

      The project was purchased by the competition organizers.

  • TPF — Tempus Public Foundation

    • Stipendium Hungaricum Scholarship

      2023–2027

      Awarded for doctoral studies.

    • Stipendium Hungaricum Scholarship

      2015–2020

      Awarded for bachelor’s and master’s studies.

Publications

  • Taylor & Francis

    • Memory to Mind: Integrating Neuroarchitecture into the Conservation of Buddhist Sacred Heritage

      Journal of Asian Architecture and Building Engineering

      Oguz Atakan Gul · Enkhjin Gombo-Ochir

      2026

      Journal article · Heritage conservation

  • ICED

    • From Smart Buildings to Neuroadaptive Buildings: An Integrated Conceptual Framework for Human-Centered Sustainable Environmental Design

      ICED 2026 Conference Proceedings

      Oguz Atakan Gul · Donát Rétfalvi

      2026

      Conference proceedings · Neuroadaptive buildings

    • Neuroarchitectural Design of a Healing Environment: Optimizing Patient Recovery through Spatial and Sensory Integration

      ICED 2024 Conference Proceedings

      Oguz Atakan Gul

      2024

      Conference proceedings · Healing environments

  • Well-being

    • Neuroarchitectural Design of a Healing Environment: Optimizing Patient Recovery through Spatial and Sensory Integration

      Promoting the Wellbeing Concept at Medical and Public Sector of the Visegrad Region

      10 October 2024 · Pécs, Hungary

      Closing Conference · Abstract book

      Conference abstract · Healing environments

Buildings in this area